Horizontal drainage excavation procedure

Horizontal drainage excavation procedure

Construction Procedure of Surface Road Side Drainage-PART

1. OBJECTIVE: This procedure is developed to cover the safe practices required for shoring and sloping in excavation and trenching jobs. This procedure is developed to establish mandatory requirements for practices to protect personnel, property and equipment from hazards associated with excavation activities.

Get a Quote

Excavations - Construction Safety topics - HSE

Battering the excavation sides - Battering the excavation sides to a safe angle of repose may also make the excavation safer. In granular soils, the angle of slope should be less than the natural angle of repose of the material being excavated. In wet …

Get a Quote

Method Statement for Drainage Work | Builders Safety

The first stage consists of directionally drilling a small diameter pilot hole along a designed directional path. The second stage involves enlarging this pilot hole to a diameter suitable for installation of the pipeline. The third stage consists of pulling the pipeline back into the enlarged hole. Pilot Hole Directional Drilling

Get a Quote

INTRODUCTION TO TRENCHING

• The maximum horizontal width (excavation face to form a wall) at the bottom of the excavation is as wide as practical but not less than 2 feet; • All soil, equipment, and material surcharge loads are no closer in distance to the top edge of the excavation than the excavation is deep.

Get a Quote

Setting-out Procedures - Constructionsite

Tunnel An underground passage or opening in an approximate horizontal plane and which begins at the surface or from an excavation of any sort. Unprotected edge The edge of a surface from which there is a horizontal gap, void or space of more than 300 millimetres and which is not provided with a barrier to prevent a fall. 4.

Get a Quote

The Horizontal Directional Drilling Process

An investigative procedure for generating site characterization information relative to the design, pernnitting, execution, aia certidcation of horizontal directionally ddled (HDD) pipeTine instaUations is presented by this paper. Concentration -ts on proiects involving la"g" - i.e. greater than 20 inches - diameter pipe.

Get a Quote

The Horizontal Directional Drilling Process

Horizontal Drain. Horizontal drains are generally the best alternative when the depth (or distance into a slope) to desired dewatering is great and where the costs of excavation and/or placement of a trench or blanket drain are deemed to be uneconomical or unrealistic. From: Soil Improvement and Ground Modification Methods, 2015. Related terms

Get a Quote

Ch 44 - Subsoil Drainage

relevant construction safety acts and regulations shall be used. For geocomposite drains set vertically, as shown in Figure 44.1(f), the minimum trench width shall be 100 mm. • Drains should be constructed with the base of the trench at an even slope, so that the trench acts as a rubble drain even if the pipe or geocomposite drain is blocked.

Get a Quote

What is a Berm? - Definition from Trenchlesspedia

Aug 28, 2020 · A berm is a ridge or barrier constructed of compacted soil, gravel, rocks, and stones to prevent, divert, or direct water away from a particular area. It is constructed as a level space or mound that separates two areas. In trenchless construction technology, berms are constructed in order to prevent erosion and sedimentation, and in some cases

Get a Quote

Horizontal construction Definition | Law Insider

Define Horizontal construction. means the construction of any fixed work, including any irrigation, drainage, water supply, flood control, harbor, railroad, highway, tunnel, airport or airway, sewer, sewage disposal plant or water treatment facility and any ancillary vertical components thereof, bridge, inland waterway, pipeline for the transmission of petroleum or any other liquid or …

Get a Quote

Method Statement For Installation of PVC uPVC Drainage

Each floor drain shall be of UPVC construction with 700mm water seal. Drain shall be fitted with 25mm access plug for cleaning purposes and shall be of the same material as the pipe connected to it. Installation / erection procedure for drainage pipe. Prior to installation, the following will be observed and checked, as applicable

Get a Quote

Sub-horizontal drains (conventional drilling) - LaRiMit

Horizontal Drain - an overview | ScienceDirect Topics

Get a Quote

BS2823 Trenching and Excavation Procedure

Mar 17, 2013 · Work Method: The new drain positions will be set out by competent person. A trench will be excavated alone the line of the new pipe, level control by pipe laser or manual level. Access into the excavation and pipe joining only within the drag box (no persons allowed in trench when drag box is pulled to next location.

Get a Quote

Horizontal Drain - an overview | ScienceDirect Topics

Construction Procedure of Surface Road Side Drainage-PART 2 (with p…

Get a Quote

PIPELINE INSTALLATION METHODS

• Provides a variety of excavation and trenching options • High level of control over elevations/slopes • Allows a direct visual inspection of pipe • Can be used with a variety of pipe materials (PVC, HDPE, steel) • Can be used for a variety of types of pipe installation (water, sewer, storm, services) DISADVANTAGES • Large footprint

Get a Quote

Ring / Pipe Culverts Construction procedure

Apr 17, 2015 · Construction Procedure of Surface Road Side Drainage-PART 1 (with picture) March 12, 2015 Surface water ( i.e., rain water) that falls on the ground surface such as; open field, paved areas or road surface, roof tops etc …

Get a Quote

Chapter 15 Construction Survey Procedures

Oct 18, 2004 · Chapter 15 Construction Survey Procedures 15-01 General In performing construction surveying, preparation is a major part of the operation. Study the contract plans, special provisions, Standard Plans, Standard Specifications, the plan quantities, Construction Manual, and the contractor's proposal. Take appropriate

Get a Quote

CONTENTS

Required excavation volumes for side cast and full bench,construction as function of side slope. Assumed subgrade width 6.6 m and bulking factor K = 1.35 (rock). Erodible area per kilometer of road for side cast construction and full bench/end haul construction as a function of side slope angle and cut slope angle.

Get a Quote

Chapter 1 Surveying

Part 650 Engineering Field Handbook Chapter 1 Surveying 1–viii (210–VI–EFH, October 2008) Figure 1–14 Calculating horizontal latitude and longitude coordinates 1–26 from survey data Figure 1–15 Distance measured as either horizontal or slope distance 1–26 Figure 1–16 Odometer wheel 1–27 Figure 1–17 Breaking chain 1–28 Figure 1–18 Digital laser EDM 1–30

Get a Quote

BASIC Surveying Manual

drain inlet, or property corner. Distances and directions determine the horizontal positions of these points. The vertical positions are determined by differences in elevations measured from a reference location known as a benchmark. This manual presents basic principles and practices of surveying for highway construction and maintenance work.

Get a Quote